Shelter Island ramp pics 7/20/18

Discussion in 'Fishing Chit Chat' started by Bottom Line, Jul 20, 2018.

  1. Bottom Line

    Bottom Line Village idiot

    Location:
    Santee & San Quintin
    Name:
    Steve
    Boat:
    Invader CC - Bottom Line
    • Messages:
      (6,486)
    • Likes Received:
      (1,844)
    We were down at SI getting some boat stuff done and decided to check on ramp progress. They have a coffer dam in place while they are prepping/pouring the ramp.

    20180720_113350.jpg 20180720_113800.jpg 20180720_113823.jpg 20180720_114011.jpg 20180720_114018.jpg
     
    Last edited: Jul 20, 2018
  2. polfishski

    polfishski Well-Known "Member"

    Location:
    Descanso
    Name:
    Tom
    Boat:
    20 SkipJack (Tail Chaser)
    • Messages:
      (1,989)
    • Likes Received:
      (381)
    Cool, looks like its coming together. Thanks for sharing
     
  3. cortezpirasea

    cortezpirasea Pangero

    Location:
    la mesa, ca
    Name:
    Russell
    Boat:
    21 ft panga Sea Moan/17 ft gregor Pirasea II
    • Messages:
      (1,879)
    • Likes Received:
      (1,764)
  4. waynesworld

    waynesworld Well-Known "Member"

    Location:
    Escondido
    Name:
    Wayne
    Boat:
    Sold it -need a ride
    • Messages:
      (2,088)
    • Likes Received:
      (226)
    I spoke with a port employee and they are shooting (Ramp ready) for the Lobster opener
    Will they make it?????
     
  5. plj46

    plj46 I've posted enough I should edit this section

    Location:
    Socal
    Name:
    jim
    Boat:
    24 ft grady white
    • Messages:
      (5,641)
    • Likes Received:
      (4,603)
    I don't see the big barge,is it still there somewhere ? if it's gone that's a good thing.And are they actually pouring/pumping the ramp ?
     
    Bottom Line likes this.
  6. plj46

    plj46 I've posted enough I should edit this section

    Location:
    Socal
    Name:
    jim
    Boat:
    24 ft grady white
    • Messages:
      (5,641)
    • Likes Received:
      (4,603)
    They were also shooting to be done in March.We'll see.
     
    Natural_one likes this.
  7. skrilla

    skrilla allirks

    Location:
    San Diego
    Name:
    Len
    Boat:
    plastic fantastic
    • Messages:
      (1,450)
    • Likes Received:
      (986)
    How long does it take for that cement to dry? Also what's the best tool to use to scribe my name?
     
    plj46, cortezpirasea and bugman like this.
  8. mullet

    mullet Metal Fabricator

    Location:
    San Fernando Valley
    Name:
    Mike
    Boat:
    19"Gregor
    • Messages:
      (3,462)
    • Likes Received:
      (2,929)
    Third pic looks like a caltrans job .Four guys standing around watching one guy leaning on a shovel.
     
    Reel_Brew, GOFAST88 and cortezpirasea like this.
  9. fly liner

    fly liner I've posted enough I should edit this section

    Location:
    hemet ca USA
    Name:
    Josh
    Boat:
    18.5 wahoo/21' crystaliner /15' prowler
    • Messages:
      (1,702)
    • Likes Received:
      (742)
    28 days for a full cure. But you'd only have a short window to scribe your name margin trowel, nail, screw driver, etc etc.
     
  10. plj46

    plj46 I've posted enough I should edit this section

    Location:
    Socal
    Name:
    jim
    Boat:
    24 ft grady white
    • Messages:
      (5,641)
    • Likes Received:
      (4,603)
    The ramp has not been poured as of today.I find it strange that the substrate is already 2' higher than the old ramp.Add some concrete and its going to have one hell of a bump from the entry/exit way to the ramp.
     
    Bottom Line likes this.
  11. dwaynesda

    dwaynesda dwayne

    Location:
    santee
    Name:
    dwayne
    Boat:
    Cabo 216
    • Messages:
      (881)
    • Likes Received:
      (300)
    The back down area will be raised 2 ft above the existing grade. Part of that due to possible sea level rising in the future.
     

Share This Page