I picked up this Skipjack last year and it ran fine till it hydro locked on me. Long story short I'm getting the motor rebuilt. I did the top half already just waiting for the bottom end to get done. In the mean time I started messing around and here is where I'm at now. Started to lay down some Seadek, not very complicated if you're able to remove everything. I'll be redoing the side panels and also re-gelcoat the bait tank. Motor should be ready in about 2 weeks.